Checklists for Quality Control Documents (QCD)

Updated on 06.02.2021
1. Checklist for Supplier Approval (SPA)
  1. Company Profile of Supplier / Manufacturer
  2. Financial Stability of the Company (Last 3 Years Financial Report)
  3. Government/Commercial Certificates (Ministry of Commerce, Chamber of Commerce, GOSI, Zakat, VAT, Saudinization, SAGIA - If Non-Saudi Company, etc.)
  4. Quality Certificates for Company (ISO)
  5. SASO Certificate / Product Registration with SABER.SA
  6. List of Project (Completed / Going on)
  7. List of Valid Products / Services
  8. Project Requirements Overview (Project Scope)
  9. List of Required Products and Products Overview
  10. Risk Management
  11. Quality Control Plan (QCP)
  12. Health and Safety Plan (HSE)
  13. Copy of approval from Riyadh Amanah / Other Government Clients
  14. Copies of pre-qualification (Approvals) by other Consultants or Contractors
  15. Product Availability
  16. Warranties (Only Required for Sub-Contractors)
  17. Company / Factory / Industry Photo Gallery (If Available)
  18. Contact / Address / Location Map
2. Checklist for Material  Approval (SAM)
  1. Copy of Supplier Approval Submission (SPA)
  2. Material Overview / Introduction
  3. Project Requirements Overview (Project Scope / BOQ)
  4. Point by Point Compliance Table for the Specifications / Codes.
  5. Quality / Compliance Letters and Certificates.
  6. Related Supportive Project Drawings ( Sectional/Architectural/MEP)
  7. Technical Data Sheets (TDS) of the proposed material
  8. SASO Certificate / Product Registration with SABER.SA
  9. Material Test Certificates / Reports as per Standard
  10. Method Statement / Installation Procedure
  11. Product Gallery
  12. Material Sample
3. Checklist for Material  Inspection Request (MIR)
  1. Copy of Supplier Approval Submission (SPA)
  2. Copy of Material Approval Submission (SAM)
  3. Log of Incoming Material from Project Store
  4. Copies of Delivery Notes (DN)
  5. Copy of Technical Data Sheet (TDS)
  6. Attach Tags / Stickers at Products (Photos / Scanned / Photo Copies)
  7. Attach Pictures (If any)
4. Checklist for Request for Test (RFT)
  1. Reference for Testing
  2. Test Results Reports
  3. Project Specifications
  4. Pictures of items while testing (If any)

SUBMITTAL MANDATORY ATTACHMENT LIST (Added on 08/05/2021)

  1. Company Profile
  2. Completed Project List (Scope Related)
  3. Ongoing Projects List (Scope Related)
  4. Commercial Registration (Commerce & Investment)
  5. Saudi Contractor’s Authority (SCA) Certificate
  6. Chamber of Commerce
  7. GOSI Certificate
  8. Zakat & Tax Certificate
  9. VAT Registration Certificate
  10. Saudization Certificate
  11. Saudi Council of Engineers Certificate
  12. ISO Certificate
  13. Company Organizational Structure / Chart with Contact Details
  14. Manpower & Technical Staff List
  15. Machinery & Equipment
  16. Manufacture Production Capacity
  17. Project Pre-Qualification Criteria
  18. Quality Control Plan
  19. HSE Plan
  20. Risk Management Plan
  21. Conflict of Interest Disclosure
  22. Non-Disclosure Agreement Certificate
  23.  Manufacturer – Installer / Supplier Accredit Certificate
  24. Previous Client Informed Counsel
  25. Country of Origin
  26. Manufacturer / Supplier’s Information
  27. Factory Location Map

SAMPLE COMMENT:

  1. The following Documents are expired. Submit Valid Certificates
  2. A material full description as per BOQ, Drawing Size, Model & as per Project Scope.
  3. Attach Project Specifications as Reference Document.
  4. Compliance Sheet for the proposed material against required material as per project specifications.
  5. Related Project Approved Shop Drawing.
  6. Related Project Specifications Copy
  7. Material Test Report as per Project Specifications / Standard
  8. Material Technical Datasheets (TDS)
  9. Material Safety Data Sheet
  10. Deliver material to the site in bundled, tagged, and marked, including factory acceptance Traceable Test / Mill Certificates (Tags must be Intact) with Valid Calibration Certificate of Testing Equipment with each delivery.
  11. The Limit of Specifications for each Result should be recorded in the test report.
  12. The delivered material shall comply with the Project Documents.
  13. All Sizes of Steel bars should be tested (Mechanical and Chemical) by an approved 3rd Party Lab.
  14. Conduct material Sampling and testing for every 100 Tons of each size of steel at delivery to site.
  15. All the reinforcement used in the Project shall comply with ASTM A615 / A615M, Grade 60, etc.
  16. Collect and test the Samples for each dia. In presence of Dar Representative.
  17. Material is subjected to use as per approved design calculations and drawings.
  18. The acceptance of this submittal does not relieve the Contractor from their contractual obligations to comply with Project Specifications and Client Requirements.
  19. Cutting and bending of reinforcement steel must be done according to related approved shop drawings and per project requirements.
  20. Reinforcement material at the site off the ground and covered storage shed prevents damage, rust, and accumulation of dirt or deleterious materials.
  21. Material Inspection Request to be submitted at the material delivery time.
  22. Warranty Period as per Project Requirements
  23. Supply Physical Steel Sample Board


APPROVAL COMMENTS (Disclaimer):

  1. Review and approval are for conformance with the information given and the design concept of the Project.
  2. No responsibility is assumed for accuracy or completeness of submittal dimensions, quantities, or details.
  3. The contractor is responsible to field verify all dimensions before fabrication, construction, or Installation.
  4. Coordinate with all adjacent and/or related contractors, disciplines, other equipment, and materials.
  5. Respond to and address all previous comments from Consultant.
  6. Comply with the requirements of all required approving authorities and obtain timely approval/consent as necessary.

Comments

  1. Sir thanks for valuable informations

    ReplyDelete
  2. Welcome, Thank you Engr. Luai A- Tayar for appreciation. Try to share this Blog Link with your Engineer friends to get help regarding QAQC Issues in Construction. Your valuable feed back is required always. Regards

    ReplyDelete

Post a Comment

Popular posts from this blog

Classifying Soils for Highway Construction with AASHTO M145 / ASTM D3282

Inspection Testing Plan (ITP) VS Checklist