Checklists for Quality Control Documents (QCD)
Updated on 06.02.2021
1. Checklist for Supplier Approval (SPA)
- Company Profile of Supplier / Manufacturer
- Financial Stability of the Company (Last 3 Years Financial Report)
- Government/Commercial Certificates (Ministry of Commerce, Chamber of Commerce, GOSI, Zakat, VAT, Saudinization, SAGIA - If Non-Saudi Company, etc.)
- Quality Certificates for Company (ISO)
- SASO Certificate / Product Registration with SABER.SA
- List of Project (Completed / Going on)
- List of Valid Products / Services
- Project Requirements Overview (Project Scope)
- List of Required Products and Products Overview
- Risk Management
- Quality Control Plan (QCP)
- Health and Safety Plan (HSE)
- Copy of approval from Riyadh Amanah / Other Government Clients
- Copies of pre-qualification (Approvals) by other Consultants or Contractors
- Product Availability
- Warranties (Only Required for Sub-Contractors)
- Company / Factory / Industry Photo Gallery (If Available)
- Contact / Address / Location Map
2. Checklist for Material Approval (SAM)
- Copy of Supplier Approval Submission (SPA)
- Material Overview / Introduction
- Project Requirements Overview (Project Scope / BOQ)
- Point by Point Compliance Table for the Specifications / Codes.
- Quality / Compliance Letters and Certificates.
- Related Supportive Project Drawings ( Sectional/Architectural/MEP)
- Technical Data Sheets (TDS) of the proposed material
- SASO Certificate / Product Registration with SABER.SA
- Material Test Certificates / Reports as per Standard
- Method Statement / Installation Procedure
- Product Gallery
- Material Sample
3. Checklist for Material Inspection Request (MIR)
- Copy of Supplier Approval Submission (SPA)
- Copy of Material Approval Submission (SAM)
- Log of Incoming Material from Project Store
- Copies of Delivery Notes (DN)
- Copy of Technical Data Sheet (TDS)
- Attach Tags / Stickers at Products (Photos / Scanned / Photo Copies)
- Attach Pictures (If any)
4. Checklist for Request for Test (RFT)
- Reference for Testing
- Test Results Reports
- Project Specifications
- Pictures of items while testing (If any)
SUBMITTAL MANDATORY ATTACHMENT LIST (Added on 08/05/2021)
- Company Profile
- Completed Project List (Scope Related)
- Ongoing Projects List (Scope Related)
- Commercial Registration (Commerce & Investment)
- Saudi Contractor’s Authority (SCA) Certificate
- Chamber of Commerce
- GOSI Certificate
- Zakat & Tax Certificate
- VAT Registration Certificate
- Saudization Certificate
- Saudi Council of Engineers Certificate
- ISO Certificate
- Company Organizational Structure / Chart with Contact Details
- Manpower & Technical Staff List
- Machinery & Equipment
- Manufacture Production Capacity
- Project Pre-Qualification Criteria
- Quality Control Plan
- HSE Plan
- Risk Management Plan
- Conflict of Interest Disclosure
- Non-Disclosure Agreement Certificate
- Manufacturer – Installer / Supplier Accredit Certificate
- Previous Client Informed Counsel
- Country of Origin
- Manufacturer / Supplier’s Information
- Factory Location Map
SAMPLE COMMENT:
- The following Documents are expired. Submit Valid Certificates
- A material full description as per BOQ, Drawing Size, Model & as per Project Scope.
- Attach Project Specifications as Reference Document.
- Compliance Sheet for the proposed material against required material as per project specifications.
- Related Project Approved Shop Drawing.
- Related Project Specifications Copy
- Material Test Report as per Project Specifications / Standard
- Material Technical Datasheets (TDS)
- Material Safety Data Sheet
- Deliver material to the site in bundled, tagged, and marked, including factory acceptance Traceable Test / Mill Certificates (Tags must be Intact) with Valid Calibration Certificate of Testing Equipment with each delivery.
- The Limit of Specifications for each Result should be recorded in the test report.
- The delivered material shall comply with the Project Documents.
- All Sizes of Steel bars should be tested (Mechanical and Chemical) by an approved 3rd Party Lab.
- Conduct material Sampling and testing for every 100 Tons of each size of steel at delivery to site.
- All the reinforcement used in the Project shall comply with ASTM A615 / A615M, Grade 60, etc.
- Collect and test the Samples for each dia. In presence of Dar Representative.
- Material is subjected to use as per approved design calculations and drawings.
- The acceptance of this submittal does not relieve the Contractor from their contractual obligations to comply with Project Specifications and Client Requirements.
- Cutting and bending of reinforcement steel must be done according to related approved shop drawings and per project requirements.
- Reinforcement material at the site off the ground and covered storage shed prevents damage, rust, and accumulation of dirt or deleterious materials.
- Material Inspection Request to be submitted at the material delivery time.
- Warranty Period as per Project Requirements
- Supply Physical Steel Sample Board
APPROVAL COMMENTS (Disclaimer):
- Review and approval are for conformance with the information given and the design concept of the Project.
- No responsibility is assumed for accuracy or completeness of submittal dimensions, quantities, or details.
- The contractor is responsible to field verify all dimensions before fabrication, construction, or Installation.
- Coordinate with all adjacent and/or related contractors, disciplines, other equipment, and materials.
- Respond to and address all previous comments from Consultant.
- Comply with the requirements of all required approving authorities and obtain timely approval/consent as necessary.