Posts

Showing posts with the label Asphalt

Prime Coat (MC-1)

Image
Prime coat typically is application of low viscosity Bitumen over a granular base, preparing it for laying an asphalt mixture on it. A prime coat performs several important functions. Coats and bonds loose material particles on the surface of the base. Hardens or toughens the surface of the base. Waterproofs the surface of the base by plugging capillary or interconnected voids Provides adhesion or bond between the base and the asphalt mixture. Bitumen emulsions used for Prime Coat are Cationic Slow Setting Emulsion 1 and Cationic Slow Setting Emulsion 2 as per latest MoRTH specifications.

Method Statement for Asphalt Paving Works

Image
Method Statement for Asphalt Paving Works (Civil Engineering) Effective Date: Document No.: Approved By:     Eng. Muhammad Arif PROJECT NAME: -------------------------------------------------------------------------- SAMPLE 1 TABLE OF CONTENT 1.      ACTIVITY 2.      INTRODUCTION 3.      TERMINOLOGY 4.      SIGNIFICANT HAZARDS IDENTIFIED 5.      ROLES & RESPONSIBILITY AND ORGANIZATION CHART 6.      SEQUENCE OF ACTIVITIES WITH RESPONSIBILITIES 6.1    Pre-commencement Requirements 6.2   General Requirements 6.3   Co-ordination with Other Trades 6.4    Delivery, Storage & Handling of Materials 6.5    Execution 7.      REQUIREMENTS  7.1   Plans/Records & Job instructions (Documentations)  7.2   Training ...