Factors to be taken care, prior to placement of Concrete!
Major factor should be considered when placing the concrete on-site delivered from the batching plant/Mixing plant, Many and varied below:-
- Ambient temperature (The Weather During the Casting Time)
- Specification for the Mix Design
- Sub-grade Condition
- Type of Installation (Lean, Structure, Column, Beam, etc.)
- Form Securement
- Type of reinforcement
- Sufficient personnel capable of placing the concrete.
- Pouring Rate
- Height of Free Fall of Concrete must not be more than 1.2 m.
- Avoid Cold Joints